\title{\bf Ultra-Low Cost Coil Fabrication Approach for ARIES-ST
}

\author{L. M. Waganer, D. A. Deuser, K. T. Slattery, G. W. Wille \\
The Boeing Company, St Louis MI \\
F. Arcella and B. Cleveland \\
AeroMet Corp. \\
}


\date{}
\maketitle

\begin{abstract} 

The extremely large capital expense of fusion power core components has
severely diminished the overall attractive features of fusion-generated
electrical power.  A fresh examination of possible new manufacturing techniques
yielded two advanced methods, that is further developed, could be low cost. We
have studies these methods to fabricate the massive toroidal field (TF) coils
of the ARIES Spherical Torus (ARIES-ST) conceptual power plant.  These
innovative fabrication approaches are estimated to reduce the capital costs of
the TF centerpost and return leg shell by an order of magnitude from
conventional fabrication processes.  This capital cost reduction will, in turn,
reduce the cost of electricity by approximately 10\%.

\end{abstract}

\newpage

\section{Introduction}
\label{s-1}

The investigation of the fabrication approaches and detailed costing of the
toroidal field (TF) coil system did not begin early in the design phase of
ARIES-ST.  Rather, the ARIES-ST conceptual design evolved from parametric
studies to optimize the plasma size and shape to yield lowest cost of
electricity while satisfying the necessary plasma physics requirements.  Only
after the plasma and design parameters were largely established and the
configuration was nearly final did the TF coil fabrication approach and
economic evaluation commence.

The ARIES system code~\cite{Naj91,Bathke77} has been used over many years to
evaluate a series of tokamak conceptual designs with many plasma configurations
and power core system variations.  This code has evolved as the various
conceptual power plant designs have been evaluated.  The code models and
adjusts the physics parameters of the plasma, magnetic field and coil
configurations, power core component engineering parameters, and general power
core configuration and determines the capital and operating costs of the entire
power plant to arrive at an optimized cost of electricity.

To efficiently examine the multidimensional parameter space mentioned above,
the level of detailed cost estimating is constrained to the level of a system
(instrumentation and control) or a component (power supply or poloidal field
coil).  Historically, costs for these systems or components have been estimated
by several researchers, as documented in Starfire~\cite{STARFIRE} and
ARIES-RS~\cite{Bathke77}.  Cost estimating relationships for these systems and
components have been developed employing the significant cost drivers, thus
enabling parametric cost modeling for use in system analysis codes.  These cost
estimating relationships are usually based on one or more statistically
significant parameters (weight, power, current, stored energy) that estimate
the system or component cost with a reasonable degree of accuracy.  

Normally, the significant capital cost elements in tokamak reactors are the
nuclear power core (first wall, blanket, shielding, coils, and ancillary
systems), reactor plant equipment (power supplies, heat transfer and transport
systems, {\it etc.}), and plant buildings, roughly in equal parts.  The content
of the latter two categories is based upon conventional electrical power
generation experience and little can be done to modify or reduce these designs
and costs.  For conventional tokamak fusion power plants, the emphasis has been
on improving performance and reducing the cost of the power core.  The tokamak
power core is roughly divided into three large, similar-sized capital cost
accounts: the first wall, blanket, and shielding system; the coil system; and
all other ancillary systems (heating, current drive, vacuum pumping, support
structure, {\it etc.}).  So the emphasis is to improve the performance in all
areas of the conventional power core because they contribute rather equally to
the cost of electricity.

In the case of the spherical
torus~\cite{Naj00,Jardin00,Tillack00,Elg00,Khater00,Resier00,Brom00}, the
optimal configuration generally favors a low aspect ratio of 1.4 to 1.6 that
causes the plasma to be very tall and very close to the centerpost.  All the
coil current for the toroidal field coil system must flow through the
centerpost.  It is not feasible to have a power-generating or tritium-breeding
blanket on the inboard area of the centerpost.  So the blanket and shield
system of the spherical torus is not as extensive and costly compared to the
conventional tokamak.  However, the cost of the TF coil system has increased
significantly as it has grown in height.  Trade studies generally favor a
normally conducting TF coil as opposed to superconducting coils, but the sheer
size and complexity determine and drive the system costs higher than the
traditional tokamak design.

In this light, the ARIES-ST team thought it would be worthwhile to conduct a
study of the evolving TF coil design.  Boeing was commissioned to review the
design approach, develop a fabrication concept for the centerpost and return
shell, and prepare a cost estimate.  The main purpose was to validate the
fabrication technique and capital cost for the dominant cost item in the plant.

\section{Costing Groundrules}
\label{s-2}

The design basis is the ARIES-ST centerpost and the complete shell return (as
opposed to discrete return legs).  The costs are estimated in current 1998
dollars. The plant is assumed to be the tenth of a kind plant, so all
developmental problems have been solved and no development costs are applicable
to this unit.  Because the proposed fabrication methods are not mature, the
cost estimates are based upon those for materials with more mature data.

\section{Design Basis}
\label{s-3}

The design basis for the ARIES-ST centerpost and TF return shell is shown in
Fig.~\ref{ast-9-01}.  The return TF coil system could have been discrete
coils, but to obtain low aspect ratio plasma, the outer legs are relatively
close to the outer surface of the plasma.  If it were necessary to move the
legs outboard to obtain more clearance, the entire size of the TF coil system
becomes very large.  With the discrete coils relatively close to the plasma, TF
field ripple was a concern.  So a continuous shell approach for the TF return
currents was adopted.  There is also a need for a vacuum shell in this region,
so the shell could also function as that element.  

As shown in Fig.~\ref{ast-9-01}, there are four parts to the TF coil system.
The 30-m-long centerpost is comprised of a tapered section in the upper region
to electrically mate with the outer shell, a straight cylindrical section that
is in close proximity with the plasma, and a larger cylindrical section at the
bottom to increase the conductive area to the maximum extent to lower ohmic
losses.  The 30-meter, unitary centerpost is constructed of high-conductivity
copper.  It is cooled with low-temperature water in a single pass
configuration.  The centerpost is comprised of roughly 85\% copper and 15\%
water.  This part weighs approximately $0.851\times 10^6$~kg.  As mentioned
earlier, there is shielding for the region close to the plasma, but that is not
a part of the TF coil system.

The outer shell has three distinct parts.  An upper shell extends from the top
of the centerpost to the midplane where it is connected to one of the power
supply busbar leads.  The middle shell extends from midplane, where the other
busbar connection is made, down to a maintenance break.  The third shell is
from the maintenance break down to the lower connection to the centerpost.
This shell is removable during maintenance actions.  The outer shells could be
made from either copper or aluminum.  Copper is more conductive than aluminum
but it would be heavier for the same effective conductivity.  The thickness of
the aluminum shell would be adjusted to yield the proper coil resistance and
recirculating power losses.  Again, the shells would be water cooled with an
overall 15\% water fraction.

\section{Conventional Fabrication Approach}
\label{s-4}

The conventional method of constructing the copper centerpost assembly with
internal water passages would be to fabricate wedges with grooves for the
coolant and then weld the entire assembly in a fixture to minimize distortion.
This would be a difficult and costly technique involving extensive welding and
inspection.  The overall length of the assembly is 30~meters, which would
require several joints to form the entire length.  The diameter of the central
region is 1.6~m while the lower section is 3.35~m.  Welding is recommended only
on the outer surface areas.  The inner joint conceivably could be joined with a
hot isostatic pressed (HIP) assisted diffusion bonding process, but there is a
current size limitation of around 1.5~m diameter and 3~m in length.  It is
unlikely this will ever be feasible for a 3.5~m monolithic component 30~m in
length.  Diffusion bonding with axial pressure would not be feasible because of
extreme forces needed for the large cross-sectional area.  At present, the only
conventional fabrication approach that might be feasible, but very costly,
would be to change the design to welded, built-up radial layers with integral
colling passages. The cost to conventionally fabricate this part is well over
\$80/kg, thus this $0.851\times 10^6$~kg assembly would likely cost \$70M to
\$100M or more.  And since this component must be replaced on a two to three
year basis, this is a recurring cost item.

The thicker cross-sections of the TF shells (up to 2.5 to 3.0-m thick) at the
top and bottom complicates the fabrication approach.  The most likely approach
is to cast the TF shells in smaller pieces and then join sectors together by
welding.  The internal water passages are difficult to reliably join.  If
aluminum is chosen, separate stainless steel coolant tubes may be necessary for
high reliability and long-term operation.  There is also a concern about
obtaining a reliable bond between the tube and the base metal to assure
effective heat transmission across the bond line.  The unit cost to fabricate
such an aluminum component might well be over \$100/kg.  The total weight of
the three aluminum shells is $2.69\times 10^6$~kg, which would yield a total
cost of \$270M or more.  If it were constructed of copper, the cost would be
significantly higher.

The conclusion is that a conventional approach is not an attractive and
cost-effective way to fabricate these components primarily because of the
complexity and difficulty in joining details.  Instead alternative,
innovative fabrication technologies were investigated.

\section{Ultra-Low Cost Fabrication Approaches}
\label{s-5}

The use of an improved fabrication process to yield an improved product at
perhaps a lower cost depends upon the advent and evolution of new techniques,
along with an application that is suitable.  In the case of the ARIES-ST
toroidal field coils, the components seem to be well suited to two new
fabrication techniques that are being developed.

The first fabrication process is laser or plasma arc forming, which melts
powdered metals and deposits them where required to form the part.  The second
process is an in-place spray casting of molten metals.  Both will be explained
in more detail below. Both of these processes provide the benefit of being able
to adapt to the large size of the ARIES-ST coils.  The parts are ``continually
being built up'' rather than joined together from many detailed pieces.

\subsection{Laser or Plasma Arc Forming}
\label{s-5-1}

The laser or plasma arc forming process is derived from the earlier
stereolithography processes to construct solid models directly from CAD
drawings.  In that process, a laser beam scans the surface of a liquid resin
to harden a layer of resin onto a substrate just below the liquid surface.
The laser illuminates just the areas representative of the first layer of the
solid model.  Then the substrate is lowered the thickness of the
just-constructed layer.  The laser then solidifies the next layer and so on
until the complete solid model is fabricated.  These solid models are useful
for prototypes and model construction.  This process has now been extended into
metals and other more substantial materials for more robust prototypes and
limited production components.

The next logical step has been to extend this technology to the fabrication of
larger structural parts.  The Advanced Research Laboratory at Penn
State~\cite{WWWPEN} in cooperation with John Hopkins University Applied Physics
Laboratory~\cite{WWWJH} and MTS Systems Corporation~\cite{WWWMTS} have
developed a laser-based process to fabricate structural components of titanium
alloys under DARPA/ORN sponsorship.  Under a Cooperative Research and
Development Agreement with the Army Research Laboratory, AeroMet
Corporation~\cite{WWWAERO}, a subsidiary of MTS Systems Corporation, installed
a large-scale laser forming system built for ARL by MTS.  In 1998, Boeing and
Grumman both awarded AeroMet contracts to fabricate parts made from a titanium
alloy, Ti-6Al-4V, to be used on aircraft.  Figure~\ref{ast-9-02} from DARPA
shows recent progress to obtain material properties, namely fatigue strength.
The test results to date lie in the range of the high end of traditional cast
and the low end of wrought titanium.  It is anticipated that copper could be
laser fabricated and exhibit properties slightly less than wrought material.

So why would laser forming be an improvement over conventional techniques?  As
an example, when aircraft transitioned from wood to metal airframes, the
then-traditional fabrication process was to use sheet metal panels and skins
with bent up sheet metal angles to form bulkheads and stiffened skin panels
fastened with rivets.  Interchangeability was poor on this process and there
was a lot of fixturing and hand fitting (costly).  This was the way aircraft
were constructed for over 30 years.  This process can be characterized by
starting with a thin panel and increasing the section thickness for the
required strength and stiffness.  The next fabrication process to be adopted
was the machining of bulkheads and structural members to make them lightweight,
even though a majority of the material had to be removed.
Figure~\ref{ast-9-03} shows an aircraft bulkhead machined from Ti-6Al-4V plate,
which illustrates the degree of complex machining necessary on some parts. The
material costs were higher and certainly the machining time was much increased;
but as most machining operations were automated, overall costs were reduced.
As the interchangeability of the parts was enhanced, the production costs were
lowered. The next evolutionary improvement is high-speed machining of the
parts to reduce the time to produce the part.
 
The laser forming process, shown schematically in Fig.~\ref{ast-9-04}, is
closer to the original stiffened skin process in that it starts with a thin
panel or skin of the required thickness.  Then a stream of powdered metal is
directed toward the part and a laser melts the metal onto the substrate.  As in
the stereolithography process, the new material is applied only where required
to form the 3-D part.  The application rate of the material is limited only to
the power of the laser and the compatibility with the material.  Plasma arc
sources seem to be better suited to copper at present.  There is little wastage
of material.  Surface finishes are typically 32 to 64~$\mu$in and may be as
good as 10~$\mu$in.  But to obtain these finishes, the application rates are
reduced.  Figure~\ref{ast-9-05} illustrates a few typical titanium parts
produced by AeroMet Corporation.  Some are in as-built condition and others
have been lightly machined to final shape as shown in Fig.~\ref{ast-9-06}.
 
The laser forming process is ideally suited to construct the copper centerpost,
shown in Fig.~\ref{ast-9-07}.  It is a rather simple geometry of cylinders and
cones with multiple, continuous coolant passages from the top to the bottom of
the part.  The bulk of the part with the integral coolant passages could easily
be fabricated with this highly automated process. An initial blank or preform
will be used to start the process at the bottom.  It is estimated that 20~kg
per hour of material could be deposited by a single forming head.  It would be
proposed that a set of 10 such laser forming heads would be simultaneously
directed to deposit each layer by layer of material.  Present experience on
stopping and restarting a single laser forming head poses no problems in
material properties or composition.  The, operation of ten multiple heads
should be feasible. If a high surface finish is desired, dedicated laser heads
could be assigned for that desired fabrication.  At the rate of 200~kg/h and
24-hour operation, the 0.85-Mkg part could be completed in roughly one-half
year, assuming no down time for maintenance and refurbishment.  Allowing a
generous allowance for downtime, the fabrication time would be eight months or
so.
 
Figure~\ref{ast-9-08} schematically illustrates how the centerpost would be
gradually grown from the initial preform.  First, the large 3.35-m
diameter cylinder would be constructed with the integral coolant passages.
Then the tapered cylinder would be grown with the coolant passages being
transitioned to those in the central 1.6-meter diameter cylinder.  Finally, the
top tapered section would be added.  Any errors detected during construction
could be machined away and new material would be deposited.  No water leaks are
permitted at the surface of the centerpost.  Leakage between coolant passages
is not anticipated, but some leakage could be tolerated.  Due to the overall
size and weight of the part, it is anticipated that the part would be
fabricated on the reactor site because shipping such a large component would be
very difficult.  Since the lifetime of the centerpost is approximately 2 full-
power years, the fabrication time is well matched to the component lifetime.
Replacement of the centerpost would be accompolished as documented in a
maintenace plan in Ref.~\cite{Naj00}.

\subsection{Spray Casting}
\label{s-5-2}

Both aluminum and copper materials were considered for the outer return TF
shell.  The aluminum was lighter for the same coil resistance (adding
additional aluminum material to compensate for its inherent lower
conductivity.)  It was also more likely to be cheaper to fabricate, thus
aluminum was selected as the material of choice for the outer shell.

Conceivably, the outer shell could be constructed with the same laser forming
process as mentioned above.  But because the weight of a TF shell is more than
three times as much as the centerpost, the time and cost to construct would be
correspondingly higher.  So another fabrication option with a faster time to
construct was considered.

Spray casting of a molten metal involves holding the metal just above the
melting temperature, atomizing it, and spraying it onto a preform structure.
This process is being evaluated as a method to construct large component parts,
as would be the case for the TF return coil shell.  This process has fast
deposition rates, estimated to be up to 0.5~kg/s per head.  To fabricate these
shells, four heads are used to help speed the process, yielding 7,200~kg/h at
full production rate.  In calculating labor hours required, an efficiency
factor of 50\% was assumed with an operator and an assistant or inspector (only
normal shifts required).  This would enable all three shells to be spray cast
in less than six months.

As a result of the faster deposition rate, the finish detail is reduced.  If a
smooth finish or precision dimensions are needed, some limited local machining
will be required at the electrical connection and support points.  On the TF
return shells, this final finish will only be required locally at the flanges
and joints with the interfacing hardware, such as the busbars and vacuum pumps.

This process requires a preform structure to initiate the process.  This is a
desirable feature for the TF shell since the preform can serve as the power
core vacuum vessel.  A thin (1/2'' or 2~cm) shell will be the interior preform
structure and also serve as the vacuum vessel.  An inspection can verify vacuum
integrity before initiating the spray casting process.  A separate cost
estimate will be conducted for this element because it will be fabricated in a
conventional manner.  The vacuum vessel will be constructed as a separate
component, but after the vacuum inspection is concluded and the spray cast
process starts, it will be an intimate part of the TF shell.

The vacuum vessel (and spray cast shell) also consists of three parts: upper,
middle, and lower.  The vacuum vessel will be the most interior portion of the
TF shell, with the spray cast aluminum being added to the exterior of the
shell.  For the present cost estimate, no cutouts or ports are assumed.
Individual vacuum vessel segments (for example, 30 orange slices, 15~m by 2~m
for the upper half) will be bump formed into the approximate hemispherical
elements and welded to form the upper hemisphere.  The flat pattern elements
can be arranged to minimize waste.  Because of the size of the finished parts,
the parts will be welded and inspected on site.

The upper hemisphere would be spray cast in its final orientation and perhaps
in its final position in the power core.  The final weight of the vacuum vessel
and spray cast shell is $1.56\times 10^6$~kg, assuming 85\% mass fraction to
allow for 15\% coolant.  The two lower shell elements will probably be spray
cast in an inverted position with trunnions added to assist in handling and
inverting the large components.  The weights are $0.584\times 10^6$~kg and
$0.584\times 10^6$~kg for the middle and lower sections, respectively.  A
wastage allowance of 5\% is allowed for the spray cast process. The aluminum
material, probably a 3536 casting alloy, would have slightly lower material
properties than a standard casting process.  This property degradation would be
compenstaed in the design analysis process.

It is not advisable for the coolant to be in direct contact with aluminum.
Therefore, it is planned to embed stainless steel tubes in the aluminum shell
to distribute the water.  As the shell is being fabricated, the tubes can be
placed in position.  The aluminum is spray cast around the tubes, embedding
them in the aluminum structure to cool the volumetric heating of the
high-energy neutrons.

Figure~\ref{ast-9-09} schematically illustrates the spray cast process.  Large
1,000-1,200~pound T-bars or sows of the appropriate aluminum alloy ({\it e.g.,}
5,000 series) are loaded into the melting furnace.  The aluminum is a high
conductivity alloy with low impurity content to minimize transmutation
products.  The gas-fired melting furnace operates in a batch mode with a
capacity in the 100,000-pound class.  The melted aluminum is transferred to a
holding furnace that precisely controls the liquid metal temperature.  A
low-pressure pump removes the liquid aluminum from the holding furnace and
transfer it to a distribution pump.  This distribution pump sends the liquid
metal through heated lines to the spray robots with high-pressure pumps for
atomizing and spraying the metal onto the preform surface.  These robots are
probably track mounted and can access the entire perimeter surface of the
shells.  A cover gas shield is necessary to minimize addition of atmospheric
impurities.  This gas shield will probably be a local shield.  The cover gas is
recovered and recycled in a dedicated system.

\section{Detailed Cost Estimates}
\label{s-6}

The cost estimates contained herein are considered detailed when compared to
previous estimates encountered in fusion conceptual designs.  But the estimates
are not considered detailed when compared to those associated with a
construction project.  These processes are quite speculative in that they have
only been demonstrated on small components (compared to the scale of the parts
referenced herein).

The costs are developed based on a mature design and mature fabrication
technology.  Both processes are assumed to be highly automated with minimal
operator or inspection oversight. The costs are reported in 1998 dollars.

To assure the estimate is conservative, the process hardware costs associated
with the laser (or plasma arc) forming and spray casting processes are included
as direct capital costs.  In the case of the laser (or plasma arc) forming of
the centerpost, the process hardware cost might best be included in an
operating capital cost since this part is frequently replaced as part of the
routine maintenance plan.  The process hardware cost for the spray cast TF
shell probably should be included as part of the Construction Services and
Equipment Account (Account 91) since it is anticipated to be a one-time
construction item.  The equipment (furnaces and other ancillary equipment)
could be rented for the initial construction or leased to a third party after
construction has been completed.  But for the present estimate, they are both
included.

To account for possible material wastage, an allowance of 5\% was added to the
material quantities purchased.  In turn, these increased material quantities
were used in the labor estimates.  An efficiency factor of 50\% was used in the
spray cast rates because of the lack of experience on parts of this scale.
Allowances for inspection and rework were provided.  An overall contingency
allowance of 20\% was added to the total estimate cost, including material,
labor, process energy, and process hardware.  A prime contractor fee of 12\%
was also included.

\subsection{Centerpost Cost Estimate}
\label{s-6-1}

The cost estimate for the copper centerpost is shown in Table~\ref{t-1}.  Each
cost element is shown along with a brief explanation of the basis for the
estimate.

\subsection{Vacuum Vessel Cost Estimate}
\label{s-6-2}

The cost estimate for the conventional construction of the aluminum vacuum
vessel is shown in Table~\ref{t-2}.  Each cost element is shown along with a
brief explanation of the basis for the estimate.  This estimate is segregated
even though it is an integral part of the TF shell.

\subsection{TF Shell Cost Estimate}
\label{s-6-3}

Two cost estimates for the aluminum TF shell are shown in Tables~\ref{t-3} and
\ref{t-4}.  Two furnace manufacturers provided cost estimates of melting and
holding furnaces.  The estimates provided by these vendors are only ROM costs
based on their interpretation of the necessary requirements and should not be
viewed as comparable bids.  Instead, they should be considered likely cost
ranges.  Each cost element is shown along with a brief explanation of the basis
for the estimate.

\subsection{Total Toroidal Field Coil Estimate}
\label{s-6-4}

The costs of the TF coil system shown in Table~\ref{t-5} are very attractive
when compared to those associated with more conventional fabrication
techniques.  Constructing the vacuum vessel using conventional techniques
results in a fabrication cost of \$85/kg.  If the centerpost and the TF
shell are also fabricated by conventional means, the cost will be approximately
ten times higher than shown in Table ~\ref{t-5}.

\section{Summary}
\label{s-7}

The innovative fabrication techniques of laser forming and spray casting offer
an ultra-low-cost approach for the centerpost and TF coil shell.  Sometimes
this is referred to as ``additive'' machining, which captures the sense that
material is added only where necessary.  These parts are very well suited to
these techniques in that they are simple continuous structures, have moderate
stresses, and have distributed internal cooling passages. Toroidal field coils
of spherical torus reactors are not the only structures that might utilize
these technologies.  Due to the significant cost and time advantages that these
ultra-low-cost processes offer, it is recommended that these technologies be
developed and applied to these and other structures.

\clearpage

\begin{thebibliography}{99}

%1
\bibitem{Naj91} \ARIESI.

%3
\bibitem{Bathke77} C.~G.~Bathke \ea, ``Systems Analysis in Support of the
Selection of the ARIES-RS Design Point,'' {\it Fusion Eng. \& Design} {\bf 38}
(1997) 59.

%2
\bibitem{STARFIRE} \STARFIRE. 

%3	(New 3)
\bibitem{Naj00} F.~Najmabadi and the ARIES Team, ``Overview of ARIES-ST
Spherical Torus Power Plant Study,'' {\it Fusion Eng. \& 
Design,} this issue.

%
\bibitem{Jardin00} S.~Jardin \ea, ``Physics Basis for Spherical Torus Power
Plants,'' {\it Fusion Eng. \& Design,} this issue.

\bibitem{Tillack00} M.~S.~Tillack, X.~R.~Wang, J.~Pulsifer, \ea, ``Fusion
Power Core Engineering for the ARIES-ST Power Plant,'' ' {\it Fusion Eng. \&
Design,} this issue.

%
\bibitem{Elg00} L.~El-Guebaly and the ARIES Team, ``ARIES-ST Nuclear
Analysis and Shield Design,'' {\it Fusion Eng. \& Design,} this issue.

%
\bibitem{Khater00} H.~Y.~Khater, E.~A.~Mogahed, I.~N.~Sviatoslavsky, \ea,
and the ARIES Team, ``ARIES-ST Safety and Design Analysis,''
{\it Fusion Eng. \& Design,} this issue.

%
\bibitem{Resier00} W.~Reiersen \ea, ``The Toroidal-Field Coil Design for
ARIES-ST,'' {\it Fusion Eng. \& Design,} this issue.

%
\bibitem{Brom00} L.~Bromberg \ea, ``Superconducting Poloidal Field Magnet
Engineering for ARIES-ST,'' {\it Fusion
Eng. \& Design,} this issue.

%4
\bibitem{WWWPEN} ``Advanced Research Laboratory at Penn State Home Page'' at
http://www.arl.psu.edu/core/laser/freeform.html.

%5
\bibitem{WWWJH} ``John Hopkins University Applied Physics Laboratory Home Page'' at
http://www.jhuapl.edu/.

%6
\bibitem{WWWMTS} ``MTS Systems Corporation Home Page'' at 
http://www.mts.com/.

%7
\bibitem{WWWAERO} ``AeroMet Home Page'' at http://www.aerometcorp.com/.

\end{thebibliography}

\newpage

\begin{table}
\vskip-1.cm
\caption{}
\centering{\bf Laser (or Plasma Arc) Formed Centerpost Cost Estimate$^{a}$}
\vspace{0.5cm}
\footnotesize
\renewcommand{\arraystretch}{1.05}
\begin{tabular} {l c c}
\hline 
Cost Elements                  & Metric Units         & English Units \\
\hline \\
Mass of centerpost, 85\% Cu, 15\% H$_2$O (11/98 strawman) 
                               & $8.51\times 10^5$ kg & $1.87\times 10^6$ lb \\
Mass including 5\% wastage     & $8.94\times 10^5$ kg & $1.97\times 10^6$ lb \\
Deposition rate with 10 laser heads (20~kg/h for each head)
                               & 200.00 kg/h          & 440.00 lb/h \\
Elapsed time (total mass/rate)                & 186.18 d \\ 
Setup time                                    & \D250.00 h  \\  
Build labor time, 1 operator + 0.5 assistant  & 6,702.41 h  \\  
Inspection and rework (25\%)                  & 1,675.60 h  \\ 
Total labor hours                             & 8,628.02 h  \\ 
Fabrication cost @ \$150/h include site premium and overtime 
                                              & \$1,294,202 \\  
\\
Material unit cost$^b$
                                              & \$2.86 \$/kg & \$1.30 \$/lb \\
Material cost                                 & \$2,555,853  \\
\\
Energy requirement/head @ 20~kg/h (heating and melting) & 3.75 kW \\
Energy input/head @ 20\% conversion efficiency          & 18.75 kW \\ 
Total energy consumption, 10 heads                      & 932,054 kWh \\
Total energy cost @\$0.10/kWh                           & \$93,205  \\
\\
Copper powder storage container                  & \D\Z\$50,000 \\
Copper powder transport system                   & \D\Z\$25,000 \\
Assembly fixture and vertical positioning system &  \D\$125,000 \\
Horizontal positioning system (coarse control)   & \D\Z\$60,000 \\
Vernier raster system (10 + frame)               &  \D\$250,000 \\
Laser forming heads (10@\$45,000 ea) + spares    &  \D\$500,000 \\
Power supplies, 200 kW total                     &  \D\$100,000 \\
Argon shield                                     & \D\Z\$24,000 \\ 
Argon supply and recovery system                 & \D\Z\$20,000 \\ 
Computer                                         & \D\Z\$25,000 \\  
Hardware cost                                    &  \$1,179,000 \\ 
\\
Subtotal                                         &  \$5,122,261 \\ 
Contingency (20\%)                               &  \$1,024,452 \\ 
Prime contractor fee (12\%)                      &  \D\$737,606 \\ 
\\
{\bf Total}                                      &  \$6,884,319 \\  
{\bf Unit cost}                                  & \$8.09 \$/kg \\  
\\ \hline
\multicolumn{3}{l}{$^a$ Assume construction within Reactor Building, 
See Act 21.02, Reactor Building cost account} \\
\multicolumn{3}{l}{$^b$ \$0.72/lb + \$0.50/lb (alloying/processing) +\$0.08
shipping.} \\
\end{tabular}
\label{t-1}
\end{table}

\begin{table}
\caption{}
\centering{\bf Vacuum Vessel Cost Estimate}
\vspace{1cm}
\small
\renewcommand{\arraystretch}{1.3}
\begin{tabular} {l c c}
\hline 
Cost Elements                            & Metric Units & English Units \\
\hline \\
Mass of 1/2"-thick plates, including wastage 
                               & $4.18\times 10^4$ kg & $9.19\times 10^4$ lb \\
Material cost, \$5/kg 5052 or 5002 plate                    & \$208,825 \\ 
\\
Bump forming, 90 panels x 60 h/panel                        & \Z5,400 h  \\ 
On-site weld setup, 6 mo x 6 people x 160h/mo               & \Z5,760 h  \\ 
Weld prep, 90 panels x 2 h/m + setup 10 h/panel x 90 panels & \Z4,776 h  \\ 
Segment welding, 900 m x 0.1312 h/m ÷ 25\% efficiency    & \Z\D472 h  \\ 
Weld inspection, 900 m x 1 h/m                              & \Z\D900 h  \\ 
Helium leak check, 900 m x 0.5 h/m                          & \Z\D450 h  \\ 
Final cleaning for vacuum service                           & \Z1,500 h  \\ 
Total labor hours                                           &  19,258 h \\
Fabrication cost @ \$120/h include site premium             & \$2,310,960 \\
\\
Subtotal                                                    & \$2,519,785 \\
Contingency (20\%)                                          & \D\$503,957 \\
Prime contractor fee                                        & \D\$362,849 \\
{\bf Total}                                                 & \$3,386,591 \\
{\bf Unit cost} of finished mass (39,776 kg)                & \$85.14 \$/kg \\ 
\\ \hline
\end{tabular}
\label{t-2}
\end{table}

\begin{table}
\vskip-1.5cm
\caption{}
\centering{\bf Spray Cast TF Shell Cost Estimate (W.J. Schafer, Inc.)$^a$}
\vspace{0.5cm}
\footnotesize
\renewcommand{\arraystretch}{1.}
\begin{tabular} {l c c}
\hline 
Cost Elements                  & Metric Units         & English Units \\
\hline \\
Mass of three shell components (new CAD weight values) 
                               & $2.69\times 10^6$ kg & $5.92\times 10^6$ lb \\
Mass including 5\% wastage     & $2.82\times 10^6$ kg & $6.21\times 10^6$ lb \\
Deposition rate per head                   & 0.50 kg/s & 1.10 lb/s \\
Number of spray heads, operational         & 4  \\
Deposition rate, 4 heads                   & 2.00 kg/s & 4.40 lb/s \\
Elapsed time (including 50\% efficiency and 10\% startup) & 35.96 d \\
Setup time                                                & \D120.00 h \\
Build labor time at 50\% efficiency, 1 operator + 1 associate or inspector
                                                          & 1,569.17 h   \\ 
Inspection and rework                                     & \D400.00 h  \\  
Total labor hours                                         & 2,089.17 h  \\  
Fabrication cost @ \$150/h include site premium and overtime 
                                                          &  \D\$313,375  \\ 
\\
Material unit cost (\$0.60/lb + \$0.25/lb for alloying \& shipping) 
                                             & \$1.87 \$/kg & \$0.85 \$/lb \\
Material cost, aluminum                                   &  \$5,281,815 \\ 
Coolant tubes, stainless steel                            & \D\Z\$50,000 \\ 
\\
Energy cost, natural gas for furnaces (use elapsed time)  & 800 \$/d \\ 
Energy cost for pumps                                     & 240 \$/d  \\ 
Energy cost total                                         & \$37,398 \\  
\\
Melting Furnace$^b$, 126,000 lb capacity, natural gas    & \Z\D\$550,000 \\ 
Installation of Melting Furnace                          & \Z\D\$225,000 \\
Holding Furnace$^b$, 60,000 lb capacity, natural gas     & \Z\D\$140,000 \\ 
Installation of Holding Furnace$^b$                      & \Z\D\Z\$70,000 \\
T-bar handling system                                    & \Z\D\Z\$25,000 \\  
Transfer pumps, 4 @ \$16k each + 1 spare                 & \Z\D\Z\$80,000  \\ 
Heated transfer piping                                   & \Z\D\$100,000 \\
Spray robots, 4 @ \$100k each                            & \Z\D\$400,000 \\
Atomizing heads with high pressure pumps$^c$, 4 @\$100k each & \Z\D\$400,000 \\
Spare parts, robots and atomizing heads (10\% factor)    & \Z\D\Z\$80,000 \\
Argon shields, 4                                         & \Z\D\Z\$24,000 \\
Argon supply and recovery system                         & \Z\D\Z\$20,000  \\
Robot rail system                                        & \Z\D\$100,000 \\ 
Spray casting computer and installation                  & \Z\D\Z\$50,000 \\
Shell handling fixtures                                  & \Z\D\$100,000 \\
Hardware costs                                           & \Z\$2,364,000 \\
\\
Subtotal                                                 & \Z\$8,046,588 \\
Contingency (20\%)                                       & \Z\$1,609,318  \\
Prime contractor fee                                     & \Z\$1,158,709 \\
{\bf Total }                                             & \$10,814,615 \\ 
{\bf Unit Cost }                                         & \$4.02 \$/kg \\ 
\\ \hline
\multicolumn{3}{l}{$^a$ Assume construction within Reactor Building, 
See Act 21.02, Reactor Building cost account.} \\
\multicolumn{3}{l}{\phantom{$^a$} Furnaces located in temporary buildings,
See Act 91, Construction Services and Equipment cost account} \\
\multicolumn{3}{l}{$^b$ Furnace cost data provided by Dave Nelson, Frank
W. Schaefer, Inc, Dayton, OH.} \\
\multicolumn{3}{l}{$^c$ Secondary use possible.}
\end{tabular}
\label{t-3}
\end{table}

\begin{table}
\vskip-1.5cm
\caption{}
\centering{\bf Spray Cast TF Shell Cost Estimate (SECO/WARWICK)$^a$}
\vspace{0.5cm}
\footnotesize
\renewcommand{\arraystretch}{1.}
\begin{tabular} {l c c}
\hline 
Cost Elements                  & Metric Units         & English Units \\
\hline \\
Mass of three shell components (new CAD weight values)
                               & $2.69\times 10^6$ kg & $5.92\times 10^6$ lb \\
Mass including 5\% wastage     & $2.82\times 10^6$ kg & $6.21\times 10^6$ lb \\
Deposition rate per head                   & 0.50 kg/s & 1.10 lb/s \\
Number of spray heads, operational         & 4  \\
Deposition rate, 4 heads                   & 2.00 kg/s & 4.40 lb/s \\
Elapsed time (including 50\% efficiency and 10\% startup) & 35.96 d \\
Setup time                                                & \D120.00 h \\
Build labor time at 50\% efficiency, 1 operator + 1 associate or inspector
                                                          & 1,569.17 h   \\ 
Inspection and rework                                     & \D400.00 h  \\  
Total labor hours                                         & 2,089.17 h  \\  
Fabrication cost @ \$150/h include site premium and overtime 
                                                          &  \D\$313,375  \\ 
\\
Material unit cost (\$0.60/lb + \$0.25/lb for alloying \& shipping) 
                                             & \$1.87 \$/kg & \$0.85 \$/lb \\
Material cost, aluminum                                   &  \$5,281,815 \\ 
Coolant tubes, stainless steel                            & \D\Z\$50,000 \\ 
\\
Energy cost, natural gas for furnaces (use elapsed time)  & 800 \$/d \\ 
Energy cost for pumps                                     & 240 \$/d  \\ 
Energy cost total                                         & \$37,398 \\  
\\
Melting Furnace$^b$, 90,000 lb capacity, natural gas      & \Z\D\$750,000 \\
Installation of Melting Furnace                           & \Z\D\$800,000 \\
Holding Furnace$^b$, 60,000 lb capacity, natural gas      & \Z\D\$600,000 \\
Installation of Holding Furnace                           & \Z\D\$500,000 \\
T-bar handling system                                     & Z\D\Z\$25,000 \\
Transfer pumps, 4 @ \$16k each + 1 spare                  & Z\D\Z\$80,000 \\
Heated transfer piping                                    & \Z\D\$100,000 \\
Spray robots$^c$, 4 @ \$100k each                         & \Z\D\$400,000 \\
Atomizing heads with high pressure pumps$^c$, 4 @\$100k each & \Z\D\$400,000 \\
Spare parts, robots and atomizing heads (10\% factor)     & \$80,000 \\   
Argon shields, 4                                         & \Z\D\Z\$24,000 \\
Argon supply and recovery system                         & \Z\D\Z\$20,000 \\
Robot rail system                                        & \Z\D\$100,000 \\ 
Spray casting computer and installation                  & \Z\D\Z\$50,000 \\
Shell handling fixtures                                  & \Z\D\$100,000 \\
Hardware costs                                           & \Z\$4,029,000 \\ 
\\
Subtotal                                                 & \Z\$9,711,588  \\  
Contingency (20\%)                                       & \Z\$1,942,318 \\   
Prime contractor fee                                     & \Z\$1,398,469 \\   
{\bf Total}                                              & \$13,052,375  \\  
{\bf Unit Cost}                                          & \$4.85 \$/kg  \\  
\\ \hline
\multicolumn{3}{l}{$^a$ Assume construction within Reactor Building, 
See Act 21.02, Reactor Building cost account.} \\
\multicolumn{3}{l}{\phantom{$^a$} Furnaces located in temporary buildings,
See Act 91, Construction Services and Equipment cost account} \\
\multicolumn{3}{l}{$^b$ Furnace cost data provided by Al Reinhart,
SECO/WARWICK, Meadville, PA.} \\
\multicolumn{3}{l}{$^c$ Secondary use possible.}
\end{tabular}
\label{t-4}
\end{table}

 \begin{table}
\caption{}
\centering{\bf TF Coil Cost Summary}
\vspace{1cm}
\renewcommand{\arraystretch}{1.3}
\begin{tabular} {l c c l}
\hline 
Component  & Finished Mass (Mkg) & Total Cost (M\$) & Unit Cost (\$/kg)\\
\hline \\
Centerpost                 & 0.851 & \Z6.88  & \Z8.09 \\
Vacuum Vessel              & 0.040 & \Z3.39  & 85.15 \\
TF Shell (average cost)    & 2.690 & 11.93   & \Z4.44 (average) \\
TF Coil System             & 3.581 & 22.20   & \Z6.20 (average) \\
                           &       &         & \Z5.89 (minimum) \\
                           &       &         & \Z6.51 (maximum) \\
\\ \hline
\end{tabular}
\label{t-5}
\end{table}

\clearpage

\begin{figure}[p]
\vskip1.in
\centerline{\hspace{2.5in} \epsfig{file=ast-9-01.ps,width=9in}}
\vskip-0.5in
\caption
{Elevation view of the ARIES-ST power core.}
\label{ast-9-01}
\end{figure}

\begin{figure}
\centerline{\epsfig{file=ast-9-02.eps,height=3.5in}}
\caption
{Fatigue testing results of laser-formed specimens.}
\label{ast-9-02}
\end{figure}
\begin{figure}
\centerline{\epsfig{file=ast-9-03.eps,height=3.5in}}
\caption{Typical titanium-machined aircraft part.}
\label{ast-9-03}
\end{figure}

\begin{figure}
\centerline{\epsfig{file=ast-9-04.eps,height=3.5in}}
\caption
{Schematic of laser forming process.}
\label{ast-9-04}
\end{figure}
\begin{figure}
\centerline{\epsfig{file=ast-9-05.eps,height=3.5in}}
\caption{Typical laser-formed parts produced by AeroMet.}
\label{ast-9-05}
\end{figure}

\begin{figure}
\centerline{\epsfig{file=ast-9-06.eps,height=3.3in}}
\caption
{A titanium part, partially final machined to illustrate the laser forming
condition and the final machining product.}
\label{ast-9-06}
\end{figure}
\begin{figure}
\centerline{\epsfig{file=ast-9-07.eps,height=3.5in}}
\caption{ Centerpost geometry.}
\label{ast-9-07}
\end{figure}

\begin{figure}
\centerline{\epsfig{file=ast-9-08.eps,height=3.5in}}
\caption
{Growth of centerpost.}
\label{ast-9-08}
\end{figure}
\begin{figure}
\centerline{\epsfig{file=ast-9-09.eps,width=6.25in}}
\caption{Overall spray cast process.}
\label{ast-9-09}
\end{figure}

%
%       FIGURE CAPTIONS
%
\clearpage

\begin{center}
{\bf List of Figure captions}
\end{center}

\noindent
{\bf Figure~\ref{ast-9-01}}: Elevation view of ARIES-ST power core.

\noindent
{\bf Figure~\ref{ast-9-02}}: Fatigue testing results of laser-formed specimens.


\noindent
{\bf Figure~\ref{ast-9-03}}: Typical titanium-machined aircraft part.


\noindent
{\bf Figure~\ref{ast-9-04}}: Schematic of laser forming process.

\noindent
{\bf Figure~\ref{ast-9-05}}: Typical laser-formed parts produced by AeroMet.

\noindent
{\bf Figure~\ref{ast-9-06}}: A titanium part, partially final machined to
illustrate the laser forming condition and the final machining product.

\noindent
{\bf Figure~\ref{ast-9-07}}: Centerpost geometry.

\noindent
{\bf Figure~\ref{ast-9-08}}: Growth of centerpost.

\noindent
{\bf Figure~\ref{ast-9-09}}: Overall spray cast process.
