%  FINAL Version
%
\documentstyle[12pt,twoside,aries]{report}
\begin{document}

\newcommand{\AI}{\hbox{ARIES-I}}
\newcommand{\AII}{\hbox{ARIES-II}}
\newcommand{\AIII}{\hbox{ARIES-III}}
\newcommand{\TI}{\hbox{TITAN-I}}
\newcommand{\TII}{\hbox{TITAN-II}}
\newcommand{\VTS}{\hbox{V-3Ti-1Si}}
\newcommand{\VCT}{\hbox{V-15Cr-5Ti}}
\newcommand{\HT}{\hbox{HT-9}}
\newcommand{\degC}{$^\circ$C}
\newcommand{\SdegC}{$\,^\circ$C}
\newcommand{\SPL}{MgAl$_2$O$_4$})
\newcommand{\AlO}{Al$_2$O$_3$}
\newcommand{\LNO}{LiNO$_3$}
\newcommand{\Z}{\phantom{0}}
\newcommand{\D}{\phantom{.0}}
\newcommand{\Y}{\phantom{$\sim$ }}
\newcommand{\X}{\times}
\newcommand{\Dtf}{\hbox{$\Delta T_f$}}
\newcommand{\Dtw}{\hbox{$\Delta T_w$}}
\newcommand{\WR}{\hbox{W-26Re}}

\title{\bf 11. DESIGN LAYOUT AND MAINTENANCE}
\author{
\hbox to \hsize{
\hbox to 2.truein{      Steven P.~Grotz        \hfil } \hfil
\hbox to 2.truein{\hfil Farrokh Najmabadi      \hfil } \hfil
\hbox to 2.truein{\hfil Leslie Bromberg        } } \\
\hbox to \hsize{
\hbox to 2.truein{      Richard L.~Creedon     \hfil } \hfil
\hbox to 2.truein{\hfil Shahram Sharafat       \hfil } \hfil
\hbox to 2.truein{\hfil Clement P.~C.~Wong     } } \\
}
\date{ }
\maketitle

\begin{titlepage}
{%\baselineskip=3.0ex
\tableofcontents
}
\end{titlepage}

\setcounter{page}{1}
\setcounter{chapter}{10}

\chapter{DESIGN LAYOUT AND MAINTENANCE}

\section{INTRODUCTION}
\label{s-11-1}

The complexity of the maintenance operation and the required time for its
completion are strongly influenced by the machine design and plant layout. The
machine should be designed to permit rapid replacement of those components that
are expected to need periodic maintenance and/or replacement. The plant layout
must also provide easy access to those components. Because of this
interconnection, operational and maintenance aspects of the \AI\ reactor have
been incorporated into the design process from the beginning. The maintenance
philosophy of the \AI\ reactor was developed through our examination of the 
maintenance procedures for commercial fission power plants, other conceptual 
fusion-reactor designs, and existing experimental fusion facilities
(\hbox{Sec.~\ref{s-11-2}}). The \AI\ fusion power core (FPC) comprises 16
self-contained large-scale modules and the maintenance approach is based on
replacing a complete large module as a single unit. All modules are pretested
prior to installation in the reactor vault. The layout of the the \AI\ FPC is
described in \hbox{Sec.~\ref{s-11-3}} and those features relevant to the
maintenance operation are emphasized. The procedure for removing the FPC
modules is presented in \hbox{Sec.~\ref{s-11-4}} and alternative maintenance
schedules are discussed. A summary and conclusions are given in
\hbox{Sec.~\ref{s-11-5}}.

\section{MAINTENANCE PHILOSOPHY}
\label{s-11-2}

The maintenance procedure for commercial fission power plants, other conceptual
fusion-reactor \hbox{designs~[\citelist{Naj90}\,--\,\citelist{Ful78}]}, and
existing experimental fusion facilities were reviewed in order to guide the
maintenance approach for the \AI\ design. In particular, the proposed plan for
replacing one of the JET toroidal-field (TF) coils during the \hbox{1989-1990}
shutdown~\cite{Rol89}, the proposed plan for replacing a superconducting TF
coil in Tore Supra~\cite{Tor90}, and the proposed plan for replacing a TF coil
of the compact ignition experiment (CIT)~\cite{CIT90} were studied. This
exercise illuminated key areas and issues for the maintenance of commercial
fusion reactors.

\subsection{Machine Design}
\label{s-11-2-1}

The complexity of the maintenance operation and the required time for its
completion are strongly influenced by the machine design and plant layout. For
example, experimental fusion facilities are designed for research and,
therefore, require numerous ports and windows to provide access for diagnostics
and experiments. Window removal and port closure alone are estimated to take
more than two weeks for the JET tokamak with equal or greater time needed for
reinstallation. A commercial reactor does not need such windows and ports.
Furthermore, experimental facilities are constantly modified for further
research and the new equipment added to a facility, unforeseen in the initial
design, further complicates the maintenance task. Lastly, changes in the
machine design in order to facilitate  maintenance operations may increase the
initial cost of the system. An obvious example is that to provide ample work
and transport area around the machine for maintenance operation, the size and
cost of the building should be increased. Unfortunately, this investment is not
usually made and results later in higher maintenance costs and/or lengthy
maintenance.

By reviewing plans for various maintenance operations for existing experimental
facilities, the following observations have been made, which can lead to
drastic reduction in the maintenance time for a fusion facility.  Most of these
observations simply allow for ready access to components that have to be
replaced. 

\begin{itemize} 
\item Avoid the need to remove other components to access the component 
that must be replaced.

\item
Make components structurally independent of any neighboring components that may
be removed. This will eliminate any need for temporary support for components
that do not have to be replaced.

\item
Minimize the number of welds to be cut and re-welded.  Eliminate complex welds
and provide easy access to components to be welded.

\item
Minimize the number of coolant supplies that have to be connected and
disconnected; coolant leaks, especially at coolant joints, are major sources
of failures.

\item
Minimize the number of connects and disconnects for electric power leads.
Locate all power leads close to each other so that the appropriate jumpers can
be removed simultaneously.

\item
Provide ample work and transport area for manipulators (or robots) and transport
equipment. Locate ancillary equipment away from these areas.

\item
All components are subject to failure, hence, the procedure and the necessary
tools for replacing every component should be included in the design.

\item
The machine design and maintenance procedures should allow for modifying and
upgrading components without impacting maintenance time and availability.

\end{itemize}

\subsection{Remote Maintenance and Robotics}
\label{s-11-2-2}

Currently, remote maintenance and robotics in some of the existing (and
planned) fusion facilities and commercial fission reactors is mostly limited to
remote manipulators controlled by a human operator. Experience indicates that
the remote manipulator takes from 3 to 10~times longer than hands-on operation 
by humans to perform the same task. This difference should be expected since
the manipulator performs the maintenance operation in series (one at a time)
and, at best, can only match the speed of a human operator. The
limitations in the capability and flexibility of the manipulators reduce the
speed of maintenance operation, with the fastest speed (threefold increase over
hands-on) accomplished by modifying the machine design and by extensive
mock-up testing before the machine is constructed. Because of this increased
maintenance time (and cost), the remote manipulators are currently used only
for operations that are hazardous to human workers.

Contrary to the above experience is the explosion in the use of robots in
factories during the last decade.  For example, assembly lines for automobile
manufacturing use robots for welding, painting, {\it etc.}  These robots
perform faster, cheaper, and with better quality control than human workers 
because: (1)~robots perform repetitive jobs and different robots perform
different jobs, (2)~the work can be performed automatically because it is
repetitive, (3)~many robots can work simultaneously to finish the work faster.

The above observations indicate that, rather than using manipulators with human
operators, the maintenance operations for a fusion facility should be
standardized and highly automated so that robots can be utilized. The
maintenance approach to unscheduled events should be similar to that for
scheduled events, and work in the reactor vault should be limited to replacing
components. Repairs to failed components, if desired, should be made afterward
and outside of the reactor vault.

\subsection{\AI\ Maintenance Philosophy}
\label{s-11-2-3}

The observations from the previous two subsections were included in the machine 
design and plant layout. The \AI\ maintenance philosophy is based on high
degrees  of standardization and automation.  Therefore, the \AI\ FPC is
composed of  16 large-scale modules that are identical. The FPC modules are
self-contained  and structurally independent of any neighboring component.

The large-scale modularity and standardization allows the maintenance of the FPC
for both scheduled and unscheduled events to be similar, basically by replacing
a complete module.  The only exception is the divertor system, which is under
considerable thermal and particle loads and may need frequent replacement.  For
this case, ports are provided to replace the divertor system unit only, instead
of replacing the complete FPC module containing that specific divertor module.
In order to facilitate the maintenance procedure, several FPC modules, all
pretested to full operational condition, are kept on site for immediate
installation in the rector vault in case of unscheduled events. Lastly, the
large-scale modularity of the system allows modification in the design of each
FPC module since each is self-contained.

A detailed description of the \AI\ design and layout is given in the next
section. The maintenance procedure is described in \hbox{Sec.~\ref{s-11-4}}.

\section{DESIGN DESCRIPTION/INTEGRATION}
\label{s-11-3}

The \AI\ FPC comprises 16 self-contained modules.  Modularity has been used in
other reactor design studies to obtain high reliability due to extensive module
pretesting and high availability through reduced downtime for scheduled and
unscheduled component replacement
\hbox{[\citelist{Naj90}\,-\,\citelist{Coh79}]}. Each of the \AI\ FPC modules
consists of one toroidal-field (TF) coil, two inboard and two outboard
first-wall, blanket, and shield sub-modules, two upper and lower divertor
targets with support structure, and a section of the vacuum vessel.  One of the
FPC modules must have a modified outboard first-wall and blanket sub-module to
accommodate the installation of the folded-waveguide RF launching structure. 
The bottom of the launching structure sits at the outboard mid-plane of the
reactor and extends vertically about 1.2~m. An elevation view of the \AI\
reactor is shown in  \hbox{Fig.~\ref{f-11-3-1}}. The self-contained FPC module
is shown in \hbox{Fig.~\ref{f-11-3-2}}.  A mid-plane radial build  with
reference dimensions is shown in \hbox{Fig.~\ref{f-11-3-3}}.
                                                                   
\begin{figure}[p]
\vspace*{7.7in}
\caption[Fig-11-3-1]
{Elevation view of the ARIES-I fusion power core.}
\label{f-11-3-1}
\end{figure}

\begin{figure}[p]
\vspace*{7.7in}
\caption[Fig-11-3-2]
{(A)~The ARIES-I self-contained FPC module. (B)~The divertor system.}
\label{f-11-3-2}
\end{figure}

\begin{figure}[t]
\vspace*{4.0in}
\caption[Fig-11-3-3]
{Mid-plane radial build of the ARIES-I fusion power core.}
\label{f-11-3-3}
\end{figure}

Each module contains primary coolant, tritium purge, and diagnostic systems in
order to minimize the number of inter-module connections.  The only interfaces
between modules are the welds in the vacuum vessel located behind the shield,
and the alignment and support structure for module installation.  The vacuum
boundary for the cryostat of the TF coil mates with the cryostats of the
bucking cylinder and the torque shells.  This configuration reduces size and
heat leakage because the magnetic loads are carried from the coil to the
support structure via cold-to-cold interfaces.  Located away from the FPC, but
still in the reactor building, the primary coolant circuits from each module
are connected to large ring headers that supply the primary coolant to the
remainder of the primary loop ({\it e.g.,} coolant circulators, steam
generators, {\it etc.}).  Similarly, the tritium purge streams are grouped
together to supply the tritium recovery system.  Remotely actuated
connect/disconnects are provided on each module to facilitate module removal
without interfering with the neighboring modules.

The detailed description of the \AI\ first-wall, blanket, and shield design is
given in \hbox{Sec.~8}.  The \AI\ FPC design uses
silicon-carbide/silicon-carbide (SiC) composite as the structural  material,
\hbox{10-MPa} helium as the coolant, \hbox{Li$_2$ZrO$_3$}  as the solid tritium 
breeder, and beryllium metal sphere-pac pellets as the neutron multiplier.  
The blanket is segmented toroidally into 32~inboard and 32~outboard poloidal
modules. Each poloidal  module comprises 17~nested, U-shaped, SiC-composite
shells. The sphere-pac solid-breeder  and Be neutron-multiplier mixture is
located between the shells.   The cylindrical helium-coolant channels are 
embedded in each of the 17~SiC-composite shells. The helium coolant enters the
blanket from the inlet plena which are located in the shield behind the blanket
and reflector.  It then flows radially inward through the shells. It cools the
shells while flowing in the toroidal direction before it turns and flows
radially back into the coolant outlet plena. This routing configuration was
selected to provide adequate  cooling of the blanket materials and to minimize
the blanket pressure  drop. The maximum blanket pressure drop of 22~kPa is at
the first wall. The corresponding total blanket internal- and external-loop
pumping power is a completely acceptable 19~MW.

The shield incorporates multiple layers of aluminum sheets sandwiched between
He-cooled, SiC shells to provide passive stabilization against vertical motion
of the plasma. There are 40 layers of 1-mm-thick aluminum sheets and 40 layers
of 19-mm-thick SiC shells for an overall shield thickness of 0.8\,m. The SiC
shells, with internal passages for helium flow, are manufactured by using the
same method as is used for the blanket shells. All of the aluminum sheets
within a module are electrically connected together at the back of the shield. 
Neighboring shield modules are also electrically connected together with a
detachable jumper  to provide a complete toroidal circuit.

An important design criteria for any tokamak reactor is that the FPC should
survive plasma disruptions.  Since the \AI\ FPC is made of SiC composite, the
only electrically conducting materials in the FPC are the passive-stabilization
aluminum sheets and the vacuum vessel.  Analysis shows that most of the
electromagnetic forces generated by a plasma disruption appear on the aluminum
sheets and, in effect, the aluminum shells shield the vacuum vessel from
disruption forces.  The disruption-induced electromagnetic forces generated in
each of the aluminum sheets are restrained by the neighboring SiC shells.

The \AI\ FPC design provides an ideal solution for supporting disruption
forces: no forces appear on the delicate first-wall and blanket components, and
the forces are distributed more or less uniformly in the shield where they are
absorbed and reacted by a massive structure. Very detailed analyses are needed
to confirm this attractive feature of the \AI\ design.  The cumulative
thickness of the aluminum layers is 40~mm, albeit the conductor is distributed
as 40 layers over the entire 0.8-m-thick shield and connected toroidally behind
the shield between neighboring modules.  Additional analysis of this
configuration is necessary to verify its exact performance in providing passive
stabilization. Analysis is also needed to confirm the location and magnitude of
the disruption-induced forces and to ensure that these forces are not
localized. 

The vacuum vessel is outside of the shield and is made of a low-activation
steel. When an individual FPC module is to be removed (or installed), welds in
the vacuum vessel must be either cut (or re-welded).  This procedure must be
performed with remote maintenance equipment.  The top, bottom, and outboard
weld seams have relatively good access for remote welding tools, cutters, {\it
etc.} The inboard vertical leg of the vacuum vessel, however, lies very near
the straight leg of the TF coil and a vertical access tunnel must be provided
so that tools can be manipulated to seal or cut this weld seam.  If neutron
shielding is unacceptably reduced by this access tunnel, a shield plug must be
installed after the welding procedure is complete. 

Although no appreciable disruption-induced forces are expected to load the
vacuum vessel, it must still support and carry the weight of the FPC module
components (except the TF coils) and any electromagnetic forces that are
absorbed by the shield and transferred to the vacuum vessel. These forces are
then carried to support pads in the lower torque shell and the total weight of
the assembly is subsequently transferred to the foundation of the reactor
building.

The large-scale modular maintenance procedure for \AI\ requires the TF coils to
be removable. This maintenance constraint is included in the TF-coil design.
Support of the electromagnetic forces acting on the TF coils is provided by
three structural members: two torque shells and a bucking cylinder
(\hbox{Fig.~\ref{f-11-3-1}}). The torque shells are axisymmetric toroidal caps
that counteract the overturning forces in the upper and lower hemispheres. The
arrangement of loads is such that comparatively small forces have to cross the
machine mid-plane, most being balanced in their own hemisphere. The small
overturning forces at the outboard mid-plane are constrained by stiffness of
the leg of the TF coil. The bucking cylinder restrains the inward radial forces
of the TF coil, as well as a small overturning force on the inner leg of the
coil.  There is zero torque on the components where the top and bottom of the
bucking cylinder meet the torque shells. There is little or no force
transmitted between the cylinder and the shells and, therefore, very little
interconnecting structure is required. Because of this structural arrangement,
only removal of the upper torque shell is needed in order to access and replace
each FPC module. The detailed structural analysis for this design is given in
\hbox{Sec.~7}. 

Another important component from the maintenance point of view is the cryostat
for the TF coils. Instead of a large cryostat for the entire device, each coil
has its own cryostat with two kinds of exterior surfaces. The first, occurring
over the entire bore surface and some of the sides and outer surface, is the
conventional type and the vacuum vessel is the visible component. The inward
progression is the super-insulation and heat-shield layers within the vacuum,
followed by a structural helium vessel and conductor matrix (or a matrix
containing small-scale helium confinements such as tubes with the case being
only structural).

The second type of exterior surface is visible and exposes the face, completely
uninsulated, of the helium vessel or other major structural case.  At the
periphery of this face, a G10 plate connects the edges of the conventional
exterior surface and the visible cryogenic components, forming a continuous
flat face.  Although this face is vacuum sealed, the magnet is not operable in
this face-exposed condition because the matrix is not coolable with one face of
its casing exposed to air.  For magnet operation, each of these exposed faces
must butt against an identical face in an adjacent FPC module, the bucking
cylinder, or the torque shells. After the faces are aligned, the cryostat is
evacuated and cool-down can begin. A typical TF coil with the interface surface
is shown in \hbox{Fig.~\ref{f-11-3-4}}.

Application of this new, cold-face concept eliminates the need to carry very
large loads from cold to warm structural elements. When the heat leakage
resulting from out-of-plane forces is calculated on a basis of cold-to-warm
structure requirements, it is 10 times higher for a conventional design than
for the proposed \AI\ cold-face cryostat system. Moreover, because the
cryostat system also deals with the center-post butting forces, the total
benefit would be several times larger ({\it i.e.,} a factor of 50 over
conventional design). Additionally,  at least 0.15\,m of space on each of the
coil cross-section dimensions is saved. The use of the cold-face cryostat gives
a new capability to avoid heat leak and allow for TF-coil removal. This
cold-face interface concept, however, requires the machining of large
components with more precision than is necessary for a conventional design.

\begin{figure}[t]
\vspace*{3.8in}
\caption[Fig-11-3-4]
{Cold-face cryostat showing cold-to-cold surface interface.}
\label{f-11-3-4}
\end{figure}

The poloidal-field (PF) coil set forms an annulus (with inner and outer
solenoids of, respectively, six and four coils) surrounding the FPC. Two
additional shaping coils are required near the $\X$-point of the divertor. The
upper torque shell and the upper shaping coil must be removed to access the FPC
modules.  The lower shaping coil is ``trapped'' beneath the FPC assembly and
the lower torque shell.  Direct access to the lower coil can be provided with a
below-grade vault in the basement of the reactor building.  However, if the
combination of dead weight and operating forces of the FPC preclude the use of
cavities in the basement of the reactor vault, then access to the lower shaping
coil will require removal of the FPC assembly and both torque shells. 
Fortunately, all of the PF coils are designed to perform for the lifetime of
the plant and access is not expected to be necessary.

\section{ARIES-I MAINTENANCE PROCEDURE}
\label{s-11-4}

The \AI\ maintenance procedure for both scheduled and unscheduled events 
centers around FPC module replacement.  Although the list of tasks to be
performed during the maintenance of the FPC is extensive, the major tasks
for \AI\ FPC module removal and replacement are: 

\begin{enumerate}

\item
Shut down the plasma in an orderly fashion by slowly reducing the plasma
fueling rate.

\item
Prepare the FPC components for maintenance operation (the following activities
are done in parallel):

\begin{itemize}
\item[A.]
Continue primary coolant flow at reduced rate, as required, to remove decay
afterheat;

\item[B.]
Continue tritium purge flow. Control the primary-coolant flow rate and
inlet and outlet temperatures and tailor the temperature distribution in the
breeder to hasten the removal of tritium;

\item[C.]
Continue vacuum pumping, as necessary, to remove tritium from the plasma
chamber;

\item[D.]
Discharge the magnets and begin to warm up the cryogenic systems associated
with the necessary maintenance (the external PF coils can remain cold during
maintenance of the FPC modules).

  \end{itemize}

\item
Valve-off and disconnect supply lines for cryo-fluids, primary coolant, and
electrical power.  Only service to affected modules and components should be
removed.  Because rapid removal of the FPC modules relies on ``grouping,'' as
many supply lines as possible will be grouped together into a single remote
connect/disconnect.  Similarly, when a single supply splits into several
sub-feeds on one module, the remote connect/disconnect will be located on the
single main supply.

\item
Break the vacuum in the plasma chamber and cut the welds of the module(s) to be
removed.  

\item
Lift the upper superstructure [\hbox{Fig.~\ref{f-11-4-1}}(A)] and transport it
to a temporary storage area.

\item
Lift the modules that are to be replaced and transport them to a hot cell where
they can be serviced after the reactor is back on line
[\hbox{Fig.~\ref{f-11-4-1}}(B)].

\item
Install new, pretested modules and re-weld the plasma chamber vacuum vessel.

\item
Reinstall the TF-coil superstructure.

\item
Connect the vacuum systems to the plasma chamber and cryostat and begin
pump-down.  Concurrently, the coolant, electric power, and cryo-fluids supplies
are reconnected.

\item
Test reactor systems and begin start-up activities.

\end{enumerate}

\begin{figure}[p]
\vspace*{7.5in}
\caption[Fig-11-4-1]
{Schematic of the movement of components during removal and replacement of an
\AI\ FPC module: (A)~Removal of the upper superstructure and (B)~Removal of a
complete FPC module.}
\label{f-11-4-1}
\end{figure}

\noindent
This procedure is used for both scheduled and unscheduled events. The FPC 
modules are tested to full operational capability so that undetected defects
may become evident. A few pretested modules are kept on site at all times for
immediate installation in the reactor vault. Minimum repair is performed in the
reactor vault.  Instead, the module containing the failed component is removed
and replaced with a new module. After the reactor is back on line, the modules
that have been removed can be serviced for later use and/or prepared for
recycling and waste disposal.

The scheduled maintenance of the \AI\ reactor consists of yearly maintenance of
the balance of plant (\hbox{$t_{BOP} = 28$~d}) and replacement of the
first-wall and blanket modules. The lifetime of the first wall and blanket is
estimated to be 20~MWy/m$^2$, based on radiation damage to the SiC-composite
structure.  Therefore, with a peak neutron wall load of 3.7~MW/m$^2$ and a 
plant availability of 76\%, the first-wall and blanket lifetime is about 7
years. Several scenarios were devised for the module replacement program, 
all of which result in complete replacement of all modules over a 7-year period:

\begin{enumerate}

\item
Replace 2~modules every year for 5~years and replace 3~modules during each of
the next 2~years, for a total replacement of all 16~modules in 7~years.

\item
Replace 4~modules (one-quarter of the FPC) every other year.

\item
Replace 8~modules (one-half of the FPC) every 4 years.

\item
Replace all 16 of the modules at the end of life
(every 7~years).

\end{enumerate}

\noindent
Of the four above options, the one that yields the highest availability is
preferable. A simple model was constructed to analyze these options.
The availability of the reactor, $p_{_F}$ can be written as
\begin{eqnarray}
\label{e-11-4-1}
   p_{_F} & = & 1 - \frac{t_s + t_u}{365}  \: ,
\end{eqnarray}
where $t_s$ and $t_u$ are, respectively, the yearly scheduled and unscheduled
maintenance times. During the yearly scheduled period, maintenance of both the
balance of plant (BOP) and the FPC is performed. Therefore, $t_s$ is the
maximum time for BOP maintenance ($t_{BOP}$) and for FPC maintenance
($t_{FPC}$):
\begin{eqnarray}
\label{e-11-4-2}
  t_s & = & \left\{ \begin{array}{l r}
                    t_{BOP} & \mbox{\hspace{1.truein}} t_{BOP} > t_{FPC} \\ 
                    \\
                    t_{FPC} & \mbox{\hspace{1.truein}} t_{BOP} < t_{FPC}
                    \end{array} \right. \: .
\end{eqnarray}

The replacement procedure for the \AI\ FPC modules contains  certain tasks that
are common and independent of the number of modules that have to be replaced 
(items 1, 2, 5, 8, and 10 of the \AI\ module replacement list, p.~11-11). 
Denoting $t_{com}$ as the duration of these common tasks, $t_{mod}$ as the 
time to replace the first module, \hbox{$\alpha t_{mod}$} as the time to 
replace subsequent modules, the time to replace $n_{mod}$ modules is
\begin{eqnarray}
\label{e-11-4-3}
  t_{FPC} & = & t_{com} + t_{mod} \left[ 1 + \alpha (n_{mod} - 1) \right] \: .
\end{eqnarray}
If \hbox{$\alpha = 1$}, the maintenance of modules is performed in series ({\it
i.e.,} maintenance operation on a subsequent module starts after the previous
module is completely removed). However, most of module-removal tasks can be
performed concurrently ({\it i.e.,} the coolant and electrical supplies to the
next module can be disconnected while the first module is being removed). For
these cases, \hbox{$\alpha < 1$}. Even a value of \hbox{$\alpha = 0$} can be
achieved if each module has its own dedicated set of equipment.

In order to simplify the analysis, it is assumed that the lifetime of the FPC
modules is 8~years (instead of 7~years for \AI).  The scenarios examined are:
replace 2~modules each year, 4~modules every 2~years, 8~modules every 4~years,
and 16~modules every 8~years (\hbox{$t_{FPC} = 0$} for those years that no
modules are replaced). Values of \hbox{$t_s = 28$~d} and \hbox{$t_u = 60$~d}
are used, which are the reference parameters for the \AI\ design. A total of 8
years of operations is considered and the availability of the reactor is
averaged over these 8~years.  Because of lack of data regarding $t_{com}$,
$t_{mod}$, and $\alpha$, the impact of these variables was examined
parametrically. \hbox{Table~\ref{t-11-4-1}} summarizes the results of this
analysis for \hbox{$t_{com} = 7,$} 14, and 28~d, \hbox{$t_{mod} = 2,$} 7, and
14~d, and \hbox{$\alpha = 1$} and 0.5.  For those cases with \hbox{$t_{FPC} <
t_{BOP}$}, the availability is determined by yearly scheduled BOP maintenance
and is 0.759.

\begin{table}[p]
\caption{}
\centering
{\bf Average Plant Availability as a Function of\\
Number of Modules Replaced Every Number of Years}\\
\vspace{1.cm}
\renewcommand{\arraystretch}{1.2}
\begin{tabular}{c  c  c  c  c  c}\hline
 $t_{com}$ (d)$^{(a)}$ 
       & $t_{mod}$ (d)$^{(b)}$
              & 2 mod/y & 4 mod/2 y & 8 mod/4 y & 16 mod/8 y \\
\hline \\
\multicolumn{6}{c}{\us{For $\alpha = 1$$^{(c)}$}} \\
 \Z7   &  \Z2  &  0.759  & 0.759  &  0.759  &  0.755  \\
 \Z7   &  \Z7  &  0.759  & 0.749  &  0.735  &  0.728  \\
 \Z7   &   14  &  0.740  & 0.711  &  0.697  &  0.689  \\
  14   &  \Z2  &  0.759  & 0.759  &  0.758  &  0.753  \\
  14   &  \Z7  &  0.759  & 0.740  &  0.730  &  0.725  \\
  14   &   14  &  0.721  & 0.701  &  0.692  &  0.687  \\
  28   &  \Z2  &  0.748  & 0.748  &  0.748  &  0.748  \\
  28   &  \Z7  &  0.721  & 0.721  &  0.721  &  0.721  \\
  28   &   14  &  0.682  & 0.682  &  0.682  &  0.682  \\
\\
\multicolumn{6}{c}{\us{For $\alpha = 0.5$$^{(c)}$}} \\
 \Z7   &  \Z2  &  0.759  & 0.759  &  0.759  &  0.759  \\
 \Z7   &  \Z7  &  0.759  & 0.759  &  0.752  &  0.746  \\
 \Z7   &   14  &  0.759  & 0.740  &  0.730  &  0.725  \\
  14   &  \Z2  &  0.759  & 0.759  &  0.759  &  0.758  \\
  14   &  \Z7  &  0.759  & 0.754  &  0.747  &  0.743  \\
  14   &   14  &  0.740  & 0.730  &  0.725  &  0.723  \\
  28   &  \Z2  &  0.751  & 0.752  &  0.753  &  0.753  \\
  28   &  \Z7  &  0.730  & 0.735  &  0.737  &  0.739  \\
  28   &   14  &  0.701  & 0.711  &  0.716  &  0.718  \\
\hbox to 0.7truein {\hfil} & \hbox to 0.7truein {\hfil} &
\hbox to 0.9truein {\hfil} & \hbox to 0.9truein {\hfil} &
\hbox to 0.9truein {\hfil} & \hbox to 0.9truein {\hfil} \\
\hline
\multicolumn{6}{l}{$^{(a)}$$t_{com}$ is the time required 
to perform common tasks regardless of the number of} \\
\multicolumn{6}{l}{\phantom{$^{(a)}$}modules to be replaced.}\\
\multicolumn{6}{l}{$^{(b)}$$t_{mod}$ is the time required 
to replace the first FPC module.} \\
\multicolumn{6}{l}{$^{(c)}$$\alpha t_{mod}$ is the time required to 
replace the second (\& subsequent) FPC module.} \\
\end{tabular}
\label{t-11-4-1}
\end{table}

The results from \hbox{Table~\ref{t-11-4-1}} indicate that the ratio of
$t_{com}/t_{BOP}$ is the major deciding factor in choosing among various
module-replacement options.  Examining cases with \hbox{$\alpha =1$}, if
\hbox{$t_{com} = t_{BOP}$} (28~d for \AI), the maintenance time for the  FPC is
always longer than $t_{BOP}$ and the difference is the time needed for module
change out. For this case, all four module changeout options yield the same
availability. If \hbox{$t_{com} < t_{BOP}$}, it is beneficial to replace the
modules gradually ({\it i.e.,} replacing 2 modules each year yields higher
availability). On the other hand, cases with \hbox{$t_{com} > t_{BOP}$} are
expected to favor replacement of all modules simultaneously.

Reducing parameter $\alpha$ results in an improvement in availability for all
cases.  Lower values of $\alpha$ also reduce the ratio of $t_{com}/t_{BOP}$
that distinguishes between yearly and complete module replacement (16~modules
every 8~years).  This observation underlines the importance of performing
maintenance tasks in parallel.

Lastly, even with long $t_{com}$ and $t_{mod}$, the minimum availability value
is 0.682 (0.718 for \hbox{$\alpha = 0.5$} and replacement of all modules). This
rather small drop in the availability reflects the fact that unscheduled
maintenance time is dominant in setting the availability values.  Analysis of
unscheduled maintenance time, $t_u$, requires data on mean time-to-failure and
mean time-to-repair for various components.  Because of the lack of data, this
analysis was not performed. Rather, attempts have been made to standardize
maintenance operations so that unscheduled events can be handled by the
scheduled maintenance methods and equipment.  It is expected that pretesting
the FPC modules and standardizing maintenance procedures will
reduce unscheduled maintenance time.

The reference maintenance scenario for the \AI\ reactor is based on replacing
two modules every year, because it is anticipated that two weeks is sufficient
time to perform common FPC maintenance tasks (\hbox{$T_{mod} = 14$~d}). As a
result, the yearly FPC maintenance can be performed within the allotted 28~d
for BOP maintenance. If $t_{com}$ exceed 28~d, then a less frequent replacement
schedule would become preferable for achieving the highest availability
possible. The dramatic impact of reactor maintenance and availability to
reactor economics should be emphasized. For a \hbox{1000-MWe} power plant with
a cost of electricity of 70~mill/kWh, a decrease of plant availability from
76\% to 75\% costs the utility company \$6~M every year.

\section{CONCLUSIONS}
\label{s-11-5}

The complexity of the maintenance operation and the required time for its
completion are strongly influenced by the machine design and plant layout.
Because of this interconnection, operational and maintenance aspects of the
\AI\ reactor have been incorporated into the design process from the beginning.
The maintenance philosophy of the \AI\ reactor was developed through our
examination of the maintenance procedures for commercial fission power plants,
other conceptual fusion-reactor designs, and existing experimental fusion
facilities.

The \AI\ maintenance philosophy is based on a high degree of standardization
and automation.  Therefore, the \AI\ FPC comprises 16 large-scale, identical
modules. The FPC modules are self-contained and structurally independent of any
neighboring component. Each of the modules consists of one toroidal-field (TF)
coil, two inboard and two outboard first-wall, blanket, and shield sub-modules,
two (upper and lower) divertor targets with support structure, and a section
of the vacuum vessel.  The limit to the number of components within a module is
principally determined by the total mass of the module to be transported. Since
the TF coils are removed during module replacement, a removable cryostat seal
is used which does not require the cutting and joining of welds to remove
cryogenic structures, further reducing the time required for maintenance.

Each module is replaced as a single unit during both scheduled and unscheduled
events. Furthermore, all modules are pretested prior to installation in the
reactor vault so that undetected defects become evident and high reliability
can be achieved.  As a result, new modules are always available for immediate
installation in the reactor vault. Minimum repair is performed in the reactor
vault.  Instead, the module containing the failed component is removed and
replaced with a new module. After the reactor is back on line, the modules that
have been removed can be serviced for later use and/or prepared for recycling
and waste disposal.

Several different maintenance schedules have been evaluated. Consideration has
been given to whether annual, two-module replacement or replacement of all 16
modules every 8 years is preferable. Since the modules are self-contained, the
interfaces with neighboring modules and support structure should be few. It is
anticipated that two modules can be replaced within the allocated \hbox{28-day}
annual scheduled maintenance period. The schedule allows for one week each to
remove and replace the two modules and two weeks for common maintenance
activities, resulting in an overall plant availability of 76\% (including
60~days for unscheduled maintenance). If module replacement and other
associated activities require much more than the allocated 28~days per year,
then a less frequent replacement schedule may be preferable to achieve the
highest availability possible.

\clearpage

\begin{thebibliography}{99}

\bibitem{Naj90} F.~Najmabadi, R.~W.~Conn, R.~A.~Krakowski, K.~R.~Schultz,
D.~Steiner, and the TITAN Research Group, ``The TITAN Reversed-Field-Pinch
Reactor Study---The Final Report,'' University of California Los Angeles,
General Atomics, Los Alamos National Laboratory, and Rensselaer Polytechnic
Institute, University of California Los Angeles report \hbox{UCLA-PPG-1200} 
(1990); also, F.~Najmabadi,
R.~W.~Conn, R.~A.~Krakowski, K.~R.~Schultz, D.~Steiner, and the TITAN Research
Group, ``Engineering and Physics of High-Power-Density, Compact,
Reversed-Field-Pinch Fusion Reactors: The TITAN Study,'' {\it Proc.\ 15th
Symp.\ Fusion Technol.\ (SOFT),} Utrecht, the Netherlands (Sept.\ 1988), {\it
Fusion Technology 88}, A.~M.~Van Ingen, A.~Nijsen-Vis, H.~T.~Klippel, Eds.,
North-Holland, Amsterdam (1989) p.~1779.

\bibitem{Cop85} C.~Copenhaver, R.~A.~Krakowski, N.~M.~Schnurr, R.~L.~Miller,
C.~G.~Bathke, \ea, ``Compact Reversed-Field Pinch Reactors (CRFPR):
Fusion-Power-Core Integration Study,'' Los Alamos National Laboratory report
\hbox{LA-10500-MS} (1985).

\bibitem{Coh79} D.~R.~Cohn, J.~H.~Schultz, L.~Bromberg, F.~Chang, D.~L.~Cook,
\ea, ``High Field Compact Tokamak Reactor (HFCTR) Conceptual Design,''
Massachusetts Institute of Technology report \hbox{MIT-RR-79-2} (1979).

\bibitem{Bak80} C.~C.~Baker, M.~A.~Abdou, R.~M.~Arons, A.~E.~Bolon,
C.~D.~Boley, J.~N.~Brooks, \ea, ``STARFIRE---A Commercial Tokamak Fusion Power
Plant Study,'' Argonne National Laboratory report \hbox{ANL/FPP-80-1}
(1980).

\bibitem{Log84} B.~G.~Logan, C.~D.~Henning, G.~A.~Carlson, R.~W.~Werner,
D.~E.~Baldwin, W.~L.~Barr, \ea, ``MARS Mirror Advanced Reactor Study Final
Report,'' Lawrence Livermore National Laboratory report \hbox{UCRL-53480}
(1984).

\bibitem{Ful78} G.~M.~Fuller and H.~S.~Zahn, ``A Comparison of Five Reactor
Concepts on the Basis of Scheduled Maintenance Requirements,'' in {\it Proc.\
3rd Top.\ Mtg.\ Technol. of Controlled Nucl.\ Fusion}  (May 1978).

\bibitem{Rol89} A.~C.~Rolfe and R.~H.~Groups, ``Shutdown Activities and
Planning,'' JET Joint Undertaking memorandum m15109 (Oct. 1989).

\bibitem{Tor90} Tore Supra Team, private communication (Jan.\ 1990).

\bibitem{CIT90} Dan Kuban, Ed., ``Collection of Documents from CIT Coil
Replacement Study, Final Review,'' Princeton Plasma Physics Laboratory
unpublished data (July 1990).

\end{thebibliography}